© ZIMBABWE Stock Exchange-listed miner RioZim says its 2 400-megawatt (MW) Sengwa thermal power project is on course despite limited finance. The coal-fired plant, which was mooted in the early 1990s, will be built in phases starting with a 700MW power station and coal mine with an annual production capacity to supply around 300 million…
